管家婆中特王中王,376969跑狗论坛资料,2024年香港正版免费大全一,2021香港内部透码,2025澳门图库

广告
Location:Home>>Industry News

Industry News

NREA to secure 180m euros in investment for Siemens wind power plant by February

Time:25 Jan,2016
The Indian Company “Gilbertaro” won the contract to supply and install the equipment required for transmitting the wind-generated electricity from the wind parks in Gabl El-Zeit in Suez’s Gulf to the National Electricity Network. The New and Renewable Energy Authority (NREA) plans to finish negotiations with 10 local and international financial institutions by February to provide 180m euros in financing for the first phase of the construction of wind fields. The project is to be implemented by the German company Siemens and will add a capacity factor of 2000megawatts (MW) of wind energy by 2022. Siemens will build up to 12 wind farms in Egypt, totaling up to 600 turbines. Chairman of the NREA Mohamed Salah El Sobky said that the authority plans to secure 180m euros for the first phase of the project in the coming days. The project’s first phase is estimated to cost 2bn euros and will add a capacity factor of 180MW. Sobky added that the authority is negotiating with the National Bank of Egypt (NBE), the Commercial International Bank (CIB), Banque Misr, Audi, Emirates NBD, International Finance Corporation (IFC), the European Bank for Reconstruction and Development (EBRD), the German Development Bank (KfW), and the African Development Bank (AfDB). El Sobky explained that the NREA seeks to obtain financing for 60% of total project costs from international financing institutions, while the remaining 30% will be provided by domestic banks. There was an initial agreement with three local banks that included NBE, Banque Misr, and CIB in order to provide needed financing for the project. Siemens will establish a factory to manufacture wind turbine blades through self-financing with investments worth 100m euros. The factory will annually produce 300 blades per year for 100 turbines that will have a capacity factor of 340MW. El Sobky said that Siemens has already begun work on the first phase of the project. Technical and financial negotiations are expected to be finished within a few weeks. After obtaining loans from banks, the NREA will present the contracts to buy the renewable energy produced from the project to Siemens for approval, according to El Sobky. Negotiations are focused on specifying the selling price per kilowatt produced from the station as well as choosing financing parties for the project. The NREA has cooperated with Siemens to carry out studies and measurements of the intensity and direction of wind, as well as topographic land studies to accelerate the project’s implementation. According to the agreement between the Ministry of Electricity and the NREA, a wind field with a capacity factor of 300MW will be established, followed by stations with capacity factors of 400MW and 500MW. Siemens will implement the project using the APC+ Finance system, which requires that the German company must provide necessary financing, while the NREA, as the project’s owner, must repay the value of the loans through which financing occurs.

CONTACT US

Tel:86-21-55155796;86-21-63563197
Fax:86-21-63561543
Address:No. 3978, Baoan Highway, Anting Town, Jiading District, Shanghai
Email:wf@wfbearings.com
Website:www.yaopeicai.com  www.wfbearings.com

Mobile SiteMobile Site

CopyRight 2017 All Right Reserved Shanghai Junwang Bearing Co.,Ltd
主站蜘蛛池模板: 澳彩十二码| 2023澳门全资料免费看| 四虎影视免费观看高清视频| 余生请多指教电视剧星辰影院 | 上海全国物流运输| 49719澳门资料| 四肖八码贴吧| 澳门黄大仙选一肖一码免费| 新澳開獎新澳門開獎結果| 澳门彩库网下载安装| 刘伯温免费中特一肖一码| 澳门正版资料免费公开2023年 | 新澳门最新开奖记录查询结果1 | 23年新澳澳门免费资料大全| 2024年香港挂牌正版大全| 免费追剧软件哪个好用| 新澳门开奖结果2024开奖记录查询表格 | 2024澳门码今晚开奖记录| 2023澳门六开彩查询记录| 澳门精准资料期期精准技巧 | 一肖一码一一持一子汗| 新澳2023年开奖记录查询表| 度度影视高清在线| 三码必中免费858449| 朱丽叶与梁山伯| 2023电影排行榜前十名| 今晚上特马开什么号码| 澳彩精准资料免费长期公开| 今天快八开奖结果| 男人的电影天堂网| 比较简单的网络游戏| 2022年院线电影排行榜| 8090影院免费高清| 二四六天天免费好彩免费资料743cc| 澳门开奖现场开奖网站开奖结果| 澳门2023王中王一肖中特| 2021年澳门免费正版资料| 初夏的甜蜜约定短剧免费观看第一集| 澳码精准100%一肖一马最准肖| 索多玛120天| 哥斯拉2怪兽之王高清在线完整版 澳门周公神算的最新版本更新内容 |